Composting facility
Treatment for a Biogas facility
Building owner:
Hufschmid Grüngut-Verwertung GmbH, Niederwilerstrasse 21, 5524 Nesselnbach
Contacts:
Contact: Mr Guido Hufschmid
Function: Building owner
Phone: +41 (0)56 622 18 47
E-Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Composting facility:
Mission:
Planning and implementation of the turnkey facility System COMPAG
Construction time:
Start in September 2013
Figures:
Investment costs included building construction: CHF 3,25 Mio.
Capacity: 12'000 tons per year
Commissioning: Spring 2014
Input: green waste from the region
Process engineering: covered composting facility System COMPAG with pressure ventilation
System Engineering: covered composting facility System COMPAG with pressure ventilation and priliminary conveyor system
Treatment for a Biogas facility
Mission:
Planning and implementation of a treatment for an existing Biogas facility.
Construction time:
Oktober 2011
Figures:
Investment: CHF 0,25 Mio.
Capacity: max. 20 t/h
Commissioning: Oktober 2011
Input: shredded green waste and liquids
Process engineering: treatment facility - System COMPAG
System engineering: mixer for liquids and solids with integrated sand discharge included weighing cells for accurate dosing